See markets served and projects completed by Wayne Crouse.

St. Clair Health - New Central Utility Plant
- Owner: St. Clair Health
- Contract Amount: $7,200,000
- General Contractor: Mascaro Construction
- Description: New Plant consisted of 4 new chillers totaling 5000 tons, Cooling Towers, Pumps, Emergency Generators, Distribution Piping, and Fuel Oil System

UPMC Shady Side Cooling Tower Upgrade
- Owner: UPMC
- Contract Amount: $2,600,000
- General Contractor: Turner Construction Company
- Description: Staged demolition of 13 cooling towers and associated piping, staged installation of 9 cooling towers over two winters.

UPMC Magee Hospital - Boiler Plant Retrofit
- Owner: UPMC
- Contract Amount: $4,643,595
- General Contractor: Rycon Construction
- Description: Staged demolition of three 500 BHP boilers and the installation of a temp boiler to avoid interruption to the hospital. Field erect four 500 BHP boilers, blowdown tank, transfer pumps, combustion air unit and stack.

Wastewater Treatment Plant Upgrade - Phase II
- Owner: Clairton Municipal Authority
- Contract Amount: $28,690,000
- General Contractor: Wayne Crouse, Inc.
- Description: Construction of membrane bioreactor treatment system, dual purpose flow storage tanks, primary clarifiers, and chloring contact tanks.

Brush Creek Water Pollution Control Facility
- Owner: Cranberry Township
- Contract Amount: $21,474,948
- General Contractor: Mascaro Construction
- Description: Installation of process mechanical equipment and piping, influent pump station, headworks building, primary clarifiers, bioreactors, membrane filtration facility, sludge thickening system, and process aeration upgrades

Beaver County Water Treatment Plant
- Owner: West View Water Authority
- Contract Amount: $12,128,036
- General Contractor: McCrossin
- Description: Installation of process mechanical equipment and piping for the authorities new water treatment plant

River Chamfer Completion - Charleroi Locks and Dam
- Owner: U.S. Army Corps of Engineers
- Contract Amount: $3,922,229
- General Contractor: Trumbull and Brayman joint venture
- Description: Installation of mechanical and piping systems for new lock chamber including HVAC and Plumbing

Interlock Control System Replacement - Braddock Locks and Dams
- Owner: U.S. Army Corps of Engineers
- Contract Amount: $808,677
- General Contractor: Thoroughbred Construction Co.
- Description: Installation of hydraulic control valves and piping

Miter Gate Hydraulic System Upgrade - Emsworth Locks and Dam
- Owner: U.S. Army Corps of Engineers
- Contract Amount: $3,312,361
- General Contractor: Wayne Crouse, Inc.
- Description: Installation of hydraulic power units and hydraulic piping

Corrections - New Central Utility Plant
- Owner: State Correctional Institute - Fayette
- Contract Amount: $6,149,600
- General Contractor: Energy Systems Group
- Description: Installation of 3 new chillers, 3 cooling towers and dunnage, 4 new high temp hot water boilers, nitrogen buffer system, associated pumps and piping

University of Pittsburgh Upper Campus Chiller Plant
- Owner: University of Pittsburgh
- Contract Amount: $16,800,000
- General Contractor: Turner Construction / Mosites Construction
- Description: New 45,000 square-foot, three story chilled water plant. Total of 7500 tons of cooling with the ability to expand for 15,000 ton. New field erected cooling towers, pumps, gray water filtration and polisher system

WVU John Chambers College of Business and Economics
- Owner: West Virginia University
- Contract Amount: $12,100,000
- General Contractor: PJ Dick
- Description: The HVAC and Plumbing contract for the new 180,000-sf, six-story Reynolds Hall. Unique to the project – a new Johnson Controls Custom Rooftop AHU consisting of 5 separate pieces with each piece weighing from 12-24k Lbs.

Ardent Pitt 1 Data Center
- Owner: Northern Data Group
- Contract Amount: $7,223,000
- General Contractor: Mission Critical Solutions, LLC / Etzel Design Build
- Description: Retrofit of an existing building, 7.51 MW liquid cooled facility (expandable to 15.1 MW, closed cell cooling tower design, 72 rear door heat exchangers, liquid cooled CRAC units, CDU units, RTU units, AHU units

NETL Computational Science and Engineering
- Owner: Department of Energy - National Energy Technology Laboratory
- Contract Amount: $8,644,000
- General Contractor: Silver Lake Construction
- Description: New 3.55 MW liquid cooled data center, closed cell cooling tower design, 97 rear door heat exchangers, AHU's, CRAC units, pump, heat exchanger, and filter room

Cordia – Uptown Energy Center
- Owner: Cordia
- Contract Amount: $8,650,000
- General Contractor: Mascaro Construction
- Description: New central plant including the installation of three 2,750 ton chillers, three 4160V 2.5Mw diesel generators, three 50,000 lb/hr steam boilers, a 3 cell cooling tower, and two 7.5 MVA transformers.

Milton S. Hershey Medical Center Co-generation Plant
- Owner: PennState Health
- Contract Amount: $2,493,434
- General Contractor: Bette Cring Construction Group
- Description: Installation of a new 7.9 MW gas-fired reciprocating engine, new 80,000 pph heat recovery steam generator, a new 1 MW black start diesel generator with new fuel oil piping and filtration system.

Energy Center Facility
- Owner: Duquesne University
- General Contractor: Wayne Crouse, Inc.
- Description: Retrofit of the existing energy system with the addition of a new natural gas turbine, a HRSG recovery steam generator, a fuel gas booster compressor, and all associated piping.

S.W. Jack Co-Generation Plant
- Owner: Indiana University of Pennsylvania
- General Contractor: Wayne Crouse, Inc.
- Description: New combined heat and power plant consisting of a 6.8 MW generator, duel fueled 8386 HP Besser Cooper Engine, boilers, and all associated piping.